Kosi Construction Machinery Co.,Ltd
|
Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Construction 6m / min Aerial Twin Mast Climbing Work Platform for Building Cleaning
Product Description
Technical data of our mast climbing platform:
SCP400/30S:
1) Max. Length: 30m
2) Rated lifting speed: 6m/min
3) Basic width: 1.5m
4) Max. Width: 2.7m
5) Motor power: 2 x 2 x 3kW
6) Max. Unattached height: 3m
7) Max. Erection height (m): 150m
8) Interval distance of tie-in: 3-9m
8) Weight of main unit: 1, 000kg
9) I type platform section length: 1.22m
10) Size of mast section (L x W x H): 650 x 650 x 1, 508mm
SCP200/12D:
1) Max. Length: 12m
2) Rated lifting speed: 6m/min
3) Basic width: 1.5m
4) Max. Width: 2.7m
5) Motor power: 2 x 3kW
6) Max. Unattached height: 3m
7) Max. Erection height (m): 150m
8) Interval distance of tie-in: 3-9m
9) Weight of main unit: 1, 000kg
10) I type platform section length: 1.22m
11) Size of mast section (L x W x H): 650 x 650 x 1, 508mm
SCP230/9D:
1) Max. Length: 9m
2) Rated lifting speed: 8m/min
3) Basic width: 1.5m
4) Max. Width: 2.7m
5) Motor power: 2 x 3kW
6) Max. Unattached height: 12m
7) Max. Erection height (m): 150m
8) Interval distance of tie-in: 3-7.5m
9) Weight of main unit: 600 kg
10) I type platform section length: 1.5m
11) II type platform section length: 0.85m
12) Size of mast section (L x W x H): 550 x 550 x 1, 508mm